Event
ENIAC rechnet mit einem neuen Code
According to a historical analysis of the ENIAC operations log, Nicholas Metropolis and Klara von Neumann worked on an expanded code for a Monte Carlo simulation of nuclear chain reactions. The study says a 79-order version was configured by 6 April 1948 and a first production run began on 17 April. Malfunctions initially disrupted the work. The authors report that operation became more reliable after the clock speed was reduced and that the work concluded on 10 May. Historical study
Instructions were held in switch-set function tables; mutable data was stored separately. This actual version should be distinguished from the uninstalled 60-order plan and a separate Los Alamos calculation in 1945.
Sources
- Historische Studie mit Auswertung des Betriebslogbuchs: Fassung, Verlauf und Anwendung; Logbuch nicht selbst eingesehen.
Offen
Die betreffenden Einträge des Betriebslogbuchs und die Programmfassung direkt prüfen. / Inspect the relevant operations-log entries and program version directly.